emilymorganti.com

Tag: Greenleaf Victorianna (Page 5 of 5)

Victorianna bathroom progress

Once the laundry closet was glued in, finishing the Victorianna’s bathroom wasn’t something I needed to do before gluing on the back wall, but once I got started on it I didn’t want to stop. I tend to save bathrooms for last — in fact, the Rowhouse’s has been sitting unfinished for two years, and […]

Built-in linen closet and jewelry finding fixtures

Continuing with the Victorianna bathroom: I made a false wall to enclose the tub, so it can be a tub/shower combo. I glued some basswood scraps together to make it the right width. My initial thought had been to add a second layer of basswood with a recessed shelf for shampoo etc, but I realized […]

Scratch-built bathroom vanity in half scale

Feeling like the 3D printed sink I bought for the Victorianna is too small, I decided to build a vanity instead. This was one of those projects where I did no advance planning and made it up as I went along. I started by building a cabinet out of scrap wood. The front and back […]

Victorianna bathroom closet

Because the Victorianna is fairly deep, I’m adding a closet to the bathroom so the room won’t be quite so massive. A couple of months ago I made a set of louvered closet doors using a 1:24 French door and a pair of 1:12 shutters. I’m getting close to gluing in the third floor and […]

Victorianna – fireplace and fake closet door

I’m still working on parts of the Victorianna that will be inaccessible once the back goes on. This week’s project: the fireplace and the wall that encloses it. I love closets in dollhouses and wanted to create one under the stairs, but it would be nearly impossible to access once the house is put together. […]

Back-to-back Victorianna staircase

I decided to “save myself some work” by using Houseworks staircases in the Victorianna, instead of building the kit stairs. I don’t know if it really saved me any work, but the first floor stairs are finally finished and they look good! I started by gluing strip wood to the side of the staircase, to […]

No mess hardwood floors made from wood veneer

I’m almost done with the Victorianna stairs (the first floor, anyway) but here’s a quick post in the meantime. Besides finishing the stairs, another task that needs to get done on the Victorianna before I can move forward with assembly is laying down the hardwood floors in areas that will be inaccessible once the back […]

Back-to-back Victorianna: starting assembly

If I’m moving at a snail’s pace with the back-to-back Victorianna, it’s only because this house requires so much thinking! Once it’s put together, some spaces (like the staircase) are inaccessible, so I have to do everything I want to do there before I put the back on. But, some spaces (like the hallways that […]

Back-to-back Victorianna: cutting pieces

Before I can start assembling the back-to-back Victorianna, I had to figure out where I wanted to cut holes for additional windows, hallways, etc. I scrutinized the dry fit from every angle and drew in the holes I wanted. The first one I tackled is the first floor passthrough from one side of the house […]

Making half scale louvered closet doors

I’ve been messing around with my Victorianna dry fit to figure out where holes need to be cut before I start gluing anything. While doing this I discovered that the Victorianna is twice as deep as its 1:12 cousin, the McKinley. (Actually, it’s roughly the same depth, but since the Victorianna is half scale, the […]

Back-to-back Victorianna: the plan

Eons ago, I saw this picture in a Nutshell News from the 80s or 90s, of two McKinley dollhouses built back to back.* It always stuck with me as a really cool bash and I wanted to try it, but with the Victorianna — the half scale version of the McKinley, which has been out […]

Newer posts »

© 2024 The Den of Slack

Theme by Anders NorenUp ↑